Stringer Repair
I received a quote from my marina to repair the 4 stringers in my boat (1997 Larson Cabrio 310) which includes entirely removing and replacing the two inner mount mount stringers that run from the transom to a bulkhead around the gas tank and cutting out a section of outer motor mount stringers where the engine bolts down to them. The forward bulkhead which is two pieces of marine ply will also be removed and rebuilt since the bond between the two pieces of plywood have come apart. They wanted 4K+. That's out of my price range so I will likely try to do this myself using the WestSystem along with the WestSystem literature on how to repair boat stringers (as well as some YouTube videos).
This weekend I want to start the work and would like to get the collective wisdom of this board to confirm I'm doing this correctly. I intend to remove and replace one stringer at a time so as to mitigate any warping or deflection. The work for each stringer will be done in 3 phases: removal, prepping for new stringer and installing the new stringer. My questions below are for the first phase. Here goes:
1 - I will measure the existing inside stringers with the motor mount tabs for all dimensions so I have numbers to make my new ones from.
2 - I will measure the location of the stringer from all sides so it is clear where the new stringer will be positioned.
3 - I will use a sawzall with a long bi-metal blade to cut the inner motor mount tabbed stringer from the transom and from the bulk head.
4 - I will use a sawzall to cut along the bottom of the stringer for the entire length and remove the glass and wood stringer from the bilge are.
5 - I will use a die grinder and belt sander to grind down any raised remaining pieces of the old stringer to create a relatively flat and smooth surface for the new stringer.
Is the above logic correct for the removal of the tabbed motor mount stringers? Anything I forget or am overlooking? Can I get away with keeping the forward bulkhead as structurally the two pieces of plywood it is made from appear to be in very good condition… they just appear to have separated from each other where they were laminated together. Can I pour an epoxy between them and clamp them back together to rebond them together as opposed to actually remove the bulkhead?
Thanks,
--Rick
I received a quote from my marina to repair the 4 stringers in my boat (1997 Larson Cabrio 310) which includes entirely removing and replacing the two inner mount mount stringers that run from the transom to a bulkhead around the gas tank and cutting out a section of outer motor mount stringers where the engine bolts down to them. The forward bulkhead which is two pieces of marine ply will also be removed and rebuilt since the bond between the two pieces of plywood have come apart. They wanted 4K+. That's out of my price range so I will likely try to do this myself using the WestSystem along with the WestSystem literature on how to repair boat stringers (as well as some YouTube videos).
This weekend I want to start the work and would like to get the collective wisdom of this board to confirm I'm doing this correctly. I intend to remove and replace one stringer at a time so as to mitigate any warping or deflection. The work for each stringer will be done in 3 phases: removal, prepping for new stringer and installing the new stringer. My questions below are for the first phase. Here goes:
1 - I will measure the existing inside stringers with the motor mount tabs for all dimensions so I have numbers to make my new ones from.
2 - I will measure the location of the stringer from all sides so it is clear where the new stringer will be positioned.
3 - I will use a sawzall with a long bi-metal blade to cut the inner motor mount tabbed stringer from the transom and from the bulk head.
4 - I will use a sawzall to cut along the bottom of the stringer for the entire length and remove the glass and wood stringer from the bilge are.
5 - I will use a die grinder and belt sander to grind down any raised remaining pieces of the old stringer to create a relatively flat and smooth surface for the new stringer.
Is the above logic correct for the removal of the tabbed motor mount stringers? Anything I forget or am overlooking? Can I get away with keeping the forward bulkhead as structurally the two pieces of plywood it is made from appear to be in very good condition… they just appear to have separated from each other where they were laminated together. Can I pour an epoxy between them and clamp them back together to rebond them together as opposed to actually remove the bulkhead?
Thanks,
--Rick