It will take about 184 kg of materials to cover that surface area with each 3mm of glass. The minimum amount of material to use 3mm coremat would total about 9mm or so. Which means it would be in the range of 552 kg of materials. The resin to fabric ratio would be around 30% fabric to 70% resin. Coremat soaks up a lot of resin, so that ratio could vary a bit.
Figure on 386kg of resin and 165kg of fabric. Fabric includes both CSM and Coremat.
A hull will take far more than that, maybe 6-7 times more, and the fabric used will cost more. Thats just the hull alone, it doesn’t include any core, stringers, bulkheads or anything else, so add in whatever structure you plan to build on the hull.
These are just rough estimates, I didn't spend much time on it.
A hull mold will take about that same amount of materials as building a hull, plus other supports and framing, and gel coat is very expensive.
So if you're on a tight budget can you afford the cost of those materials and several years of time to build and finish it?