fstarocka
Junior Member
- Joined
- Dec 1, 2014
- Posts
- 6
- Reaction score
- 1
- Location
- San Pedro, CA
Hi all - just finally got my two yanmars in the shop. my 69 owens had a 12 degree shafts 1-1/4 and now i have an 8 degree and 1-1/2 shafts 21/21 prob from a 20/16 iirc. i think i need to put one motor in on mounts loose and start measuring etc-
I have about 2" clearance currently so its going to be a close call if i can get it all to line up-
I'm going to consider prop tunnels if necessary- for a 21p prop whats an approx lead length of the tunnel?
I have about 2" clearance currently so its going to be a close call if i can get it all to line up-
I'm going to consider prop tunnels if necessary- for a 21p prop whats an approx lead length of the tunnel?