Hello everyone,
I am currently developing an 8.5 m planing power catamaran with a center-console layout, and I would appreciate the opinion of experienced naval architects, catamaran designers and boat builders regarding the minimum tunnel clearance required for good behavior in short and confused seas, particularly Mediterranean conditions.
The boat is intended for recreational use, with a target design speed of approximately 40 knots and twin outboard propulsion starting from 2 × 150 hp.
At static waterline:
My main concern is the behavior of the tunnel when the boat encounters short, steep and irregular waves, particularly the type of sea state that can be encountered in the Mediterranean.
I am specifically concerned about wave interaction inside the tunnel, bridgedeck slamming and the possibility of the tunnel becoming too close to the water surface when encountering waves.
I have received different opinions regarding the required tunnel clearance. Some have suggested that the static clearance may be relatively low, while others have pointed out that the dynamic clearance at speed is much more relevant for a planing catamaran.
I would therefore like to ask the following:
Any technical feedback, practical experience or references would be greatly appreciated.
Thank you.
I am currently developing an 8.5 m planing power catamaran with a center-console layout, and I would appreciate the opinion of experienced naval architects, catamaran designers and boat builders regarding the minimum tunnel clearance required for good behavior in short and confused seas, particularly Mediterranean conditions.
The boat is intended for recreational use, with a target design speed of approximately 40 knots and twin outboard propulsion starting from 2 × 150 hp.
Main characteristics
- LOA: 8.5 m
- Beam: 2.9 m
- Chine beam: 840mm
- Maximum displacement: 3.5 tonnes
- Draft: approximately 0.43 m
- Freeboard: 1.05 m
- Target maximum speed: around 40 knots
- Typical cruising speed: around 28 knots
- Tunnel width: 850 mm
- Twin outboard propulsion : 2 x 150 hp
- Tunnel: progressive geometry, rising significantly toward the bow
- Deadrise: 20° on the outer running surface and 24° on the inner side, increasing forward
Tunnel clearance
The tunnel clearance is not constant along the length of the boat.At static waterline:
- Transom: approximately 250 mm
- Midship: approximately 400 mm
- Transom: approximately 500 mm
- Midship: approximately 700 mm
My main concern is the behavior of the tunnel when the boat encounters short, steep and irregular waves, particularly the type of sea state that can be encountered in the Mediterranean.
I am specifically concerned about wave interaction inside the tunnel, bridgedeck slamming and the possibility of the tunnel becoming too close to the water surface when encountering waves.
I have received different opinions regarding the required tunnel clearance. Some have suggested that the static clearance may be relatively low, while others have pointed out that the dynamic clearance at speed is much more relevant for a planing catamaran.
I would therefore like to ask the following:
- For an 8–9 m power catamaran, how is the minimum tunnel clearance normally determined?
- Should the clearance be evaluated primarily at the static waterline, or is the dynamic running condition the more relevant design condition?
- Is there a useful rule of thumb relating tunnel clearance to wave height and wavelength?
- With approximately 500 mm clearance at the transom and 700 mm at midship at 40 knots, would you consider this reasonable for short and steep Mediterranean waves?
- How significant is the 850 mm tunnel width in relation to tunnel wave interaction and slamming?
- Are there published studies, experimental data or design guidelines concerning power catamaran tunnel clearance and slamming in short steep seas?
Any technical feedback, practical experience or references would be greatly appreciated.