Cockpit floor
When drawing the lines of the cockpit (see post # 3) I intended to use a single plate of 3 mm plywood as floor. The centerline of the cockpit floor between main bulkhead and transom was drawn as a straight line, sloping slightly towards the back to get the water out of the cockpit. While building I changed this plan, because
a) I doubted that 3 mm plywood would support my weight, and
b) I doubted that I could apply two types of glue and place and fix the floor to all the bulkheads and styrofoam blocks before the glue was curing.
The plan was therefore changed to four pieces of 4 mm plywood with scarf joints. The underside was coated with glass (80 g/m^2) while the plywood was bent to shape. Starting from astern the pre-bent pieces were glued in. For the connections between glass, epoxy and wood a mix of epoxy with short carbon fibers was used. The connection between the floor and the buoyancy styrofoam was done with polyurethane foam. Since this foam is curing very quickly, the whole job had to be done as fast as possible. To avoid that the expanding polyurethane lifted up the floor, I used all available clamps, weights, and adhesive tape.
With kind regards
Ara
When drawing the lines of the cockpit (see post # 3) I intended to use a single plate of 3 mm plywood as floor. The centerline of the cockpit floor between main bulkhead and transom was drawn as a straight line, sloping slightly towards the back to get the water out of the cockpit. While building I changed this plan, because
a) I doubted that 3 mm plywood would support my weight, and
b) I doubted that I could apply two types of glue and place and fix the floor to all the bulkheads and styrofoam blocks before the glue was curing.
The plan was therefore changed to four pieces of 4 mm plywood with scarf joints. The underside was coated with glass (80 g/m^2) while the plywood was bent to shape. Starting from astern the pre-bent pieces were glued in. For the connections between glass, epoxy and wood a mix of epoxy with short carbon fibers was used. The connection between the floor and the buoyancy styrofoam was done with polyurethane foam. Since this foam is curing very quickly, the whole job had to be done as fast as possible. To avoid that the expanding polyurethane lifted up the floor, I used all available clamps, weights, and adhesive tape.
With kind regards
Ara