Ronjon
Junior Member
- Joined
- Sep 22, 2020
- Posts
- 21
- Reaction score
- 14
- Location
- Charlotte, North Carolina
Sorry it's been so long, I took a 4 day weekend to make some progress on the boat. I've received a lot of info from other Tartan 34C owners so I'm gearing up to take care of the centerboard first at home, then the next time I go down to the boat, work on repairing the keel. I've also started working on refitting the interior. I'm pretty committed to putting an electric motor in to replace the Westerbeke so I've stripped anything related to the engine out. At the same time I'm rebuilding the engine with my free time at work in order to sell it to pay for the electric motor setup. I've completely removed all the leftover barnacles on the hull. I've also cleaned the inside of the keel cavity. Realized that what I thought was a hole at the top was actually rubber meant to act as a stopper for the centerboard when closed. Going to bring a long handled pole scraper to clean the centerboard trunk completely and paint it before reinstalling. The rudder shaft is slightly bent, so I removed it in order to straighten or replace it, it's not much, maybe 2 degrees. I took advantage of a calm day and took down the jib sail to inspect and store it, and I believe the roller furler needs a little work. Lastly I removed the floorboards in order to replace them, and to secure the joists to the hull. while removing those, I found the freshwater tank in the starboard settee was covered in salt buildup, so I pulled all that up in order to clean it out and rebuild the settee. Going to take advantage of it being out and re fiberglass the bulkheads to the hull and insulate any bare hull. Many more things planned but I don't want to overwhelm myself with projects halfway done.
Starboard hull clean of barnacles
Port side clean
View of keel cavity with barnacles removed
Different angle
Rudder removed
Engine fuel tank, lines, wiring harness removed
Freshwater tank removed
Starboard settee removed for insulation and repairs
Floorboards removed, bilge area cleaned
Starboard hull clean of barnacles
Port side clean
View of keel cavity with barnacles removed
Different angle
Rudder removed
Engine fuel tank, lines, wiring harness removed
Freshwater tank removed
Starboard settee removed for insulation and repairs
Floorboards removed, bilge area cleaned
Last edited: