mahogany top charts&cofee desk teak louvered doors and hatch composite console portside sliding cold molded lateral windows opening front...
I designed twin consoles into the bathroom at the forward section of the hull ; supporting the sink and acting as an extension of the bed on...
companionway teak louvered doors customised, opening dashboard opening front windows stainless hardware details http://www.yacht.ro
after 2 years and 3 months the old racer is back on water. new cold molded hull and new dynel&epoxy deck; plus all steel framing and...
black sea cruiser rudder cast in bronze.
Nuvola Rossa's restoration was as well a first; the first rebuild of a classic mahogany ronabout performed in Romania
the framing was rebuilt in laminated wood; old rotten bottom was changed with new cold molded bottom in plywood&epoxy; the 200 hp chris...
this restoration of a Riva craft was a first in Romania
design A.Rochian. fiberglass composite 27 ft cruiser
Andrew Thomas
bulwarks were rebuilt solid by cold moulding cca 12mm wood&epoxy three layers of wood.
we rebuilt the transom ; the cockpit; , revarnished the cockpit .
the deck was reinforced by one layer dynel set in west System bulwarks were rebuilt by laminating 12mm on. new brass deck hardware and deck...
western red cedar strip planking hull turning
after sailing her frm genova to bucharest , take paint off and here's the sorry condition she was in. ++70% of framing was rotten at bilge...
about the sorry condition she was in. bulwarks cracked and rotten ; deck rotten and leaking.
Passage to Lavrion Greece